How long must an operator wait after filing a notification with the Utilities Technology Council (UTC) before operating on the 2200-meter or 630-meter band?
Pick an answer to check it.
Answer: B. Operators may operate after 30 days, providing they have not been told that their station is within 1 kilometer of PLC systems using those frequencies
After notifying the UTC, an operator may begin on 2200 or 630 meters after 30 days unless told the station is within 1 kilometer of a power line carrier (PLC) system using those frequencies.
Tip: UTC: wait 30 days, 1 km rule.
FCC rule reference: Part 97.303(g)